Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

There is an underground parking, the first floor is given over to technical premises and social, commercial and cultural facilities. The adjoining territory has also been landscaped.

In the Mozhaisky district, at Kubinka street, possession 18, building 2, a residential building was commissioned, built under the renovation program. This was announced by the head Moscow Construction Department Rafik Zagrutdinov.

It is a one-section building with an underground car park. The facades are faced with porcelain stoneware slabs in bright orange tones. They are equipped with boxes for air conditioners.

There are 99 apartments in the house, of which 42 are one-room, 36 are two-room and 21 are three-room. Their total area is 5941.2 square meters. The apartments and common areas have been improved according to the renovation standard.

The first floor of the house is non-residential. It will house social, commercial and cultural facilities. In the lobby of the residential part of the house there is a duty room, storage space for cleaning equipment, an area for placing mailboxes and technical rooms. The elevators with a lifting capacity of 630 and 1000 kilograms are equipped with visual and tactile information means, as well as motion sensors.

The area near the house was landscaped: trees and shrubs were planted, recreation and sports grounds were made.

“In total, since the launch of the renovation program, 75 houses have been commissioned, most of which have been transferred for occupancy. Now another 259 houses with an area of ​​4.3 million square meters are being built and designed. 464 launch pads are in operation, ”said Rafik Zagrutdinov.

The renovation program was approved in August 2017. It includes 5174 houses, which is about 350 thousand apartments with a total area of ​​16.4 million square meters. The adjacent territory of new buildings is being landscaped, and social infrastructure is being created in the quarters.

By the end of November, the settlement of four new buildings in the South-Western Administrative District, North-Eastern Administrative District and Eastern Administrative DistrictResettlement of residents of eight houses under the renovation program completed

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News