Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

Design solution

In total, 520 residential buildings are included in the renovation program in the South-West Administrative District.

Next year, in the Obruchevsky district, they plan to commission a house under the renovation program. The new building is located at street Garibaldi, possession 18. Now the installation of monolithic structures has already been completed. Rough finishing of the interior is 90 percent completed, the builders have started finishing. This was announced by the head Moscow City Construction Department Rafik Zagrutdinov.

The monolithic house is being built according to an individual project and is a one-section building. The facades will be decorated in beige tones and faced with porcelain stoneware, baskets for air conditioners will be installed on them.

The house will have 127 apartments: 19 one-room, 90 two-room and 18 three-room. Their total area will be 7070.8 square meters. All apartments have glazed balconies and loggias.

The first floor will be non-residential. It will house a lobby, an elevator lobby, a concierge room, storage space for cleaning equipment, a mailbox area and technical rooms. In addition, social, commercial and cultural facilities will open: pharmacies, shops, cafes, service centers.

The house will have two elevators with a carrying capacity of 400 and one thousand kilograms. The new building will be equipped with an automated system for monitoring and accounting for energy consumption, video surveillance systems, security of the entrance to the building, warning and evacuation management in case of fire. There is also a one-level underground parking lot.

After completion of construction, the area around the house will be landscaped, lawns and flower beds will be laid out, trees and shrubs will be planted. A children’s playground and sports grounds, as well as recreation areas will appear. In addition, a barrier-free environment will be created for people with limited mobility.

“On the territory of the South-West Administrative District, 520 dilapidated residential buildings are included in the renovation program. To start the resettlement, 47 launch sites have been selected in the district, and work continues on the selection of new sites. In general, the implementation of the renovation program is progressing evenly throughout the city; more than 20 thousand Muscovites have already moved into new apartments. Several thousand residents of the five-story buildings are in the process of resettlement, ”said Rafik Zagrutdinov.

Renovation in South-West Administrative District: by the end of the year six houses are planned to be commissioned in the district

The renovation program started in August 2017. It includes 5174 houses. Program participants receive apartments with comfort class finishing. When designing new neighborhoods, they also take into account the need for additional social facilities – schools, kindergartens and clinics.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News