Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

Design solution

It will have 128 apartments with a total area of ​​7951.7 square meters.

The house under the renovation program in Tekstilshchiki at the address: Chistova Street, possession 3a, building 1 will be put into operation next year. This was announced by the head Moscow Construction Department Rafik Zagrutdinov… A two-section monolithic building is being built according to an individual project.

“The erection of monolithic structures has been fully completed, and the rough finishing of residential premises is underway,” the head of the department specified.

Boxes for air conditioners will be installed on the facades, and the balconies will be glazed, the facades themselves will be faced with clinker tiles. The new building will be equipped with security systems for the entrance to the building, warning and evacuation control in case of fire, fire alarms and a video surveillance system. Elevators with a lifting capacity of one thousand and 400 kilograms are equipped with visual and tactile means of information.

The first floors will be made non-residential, social, commercial and cultural facilities will be located here: pharmacies, shops, cafes, service services. In the lobby of the residential part there will be a wheelchair, a concierge room, a storage room for cleaning equipment, mailboxes. The project includes an underground one-story parking lot.

The house is designed for 128 apartments – 108 two-room and 20 three-room, their total area will be 7951.7 square meters.

The tiles with a rough surface at the entrance will prevent slipping at any time of the year. The adjacent territory will be landscaped and landscaped: a children’s playground and sports grounds and recreation areas will be equipped.

Particular attention will be paid to the development of the infrastructure of a home for residents with limited mobility and parents with small children. The entrance, the floor of the vestibule and the elevator hall on the ground floor will be flush with the ground so that the building can be entered without assistance. Also, additional parking spaces will be created here in an open flat parking.

“A total of 47 houses in Tekstilshchiki are included in the renovation program. To begin its implementation, a list of seven launch sites was formed and approved. Two of them have already been put into operation and are being settled – we are talking about house 24 and ownership of 28 on Artyukhina street. Construction is in full swing at the launch site at the address: Chistova Street, possession 3a, building 1. Three more sites are being designed, urban planning documentation is being developed for one house, “Rafik Zagrutdinov said.

The head of the Construction Department also noted that a high-quality and socially oriented urban environment will be created for the residents of the district. “Within the framework of the renovation program, the construction of a school for 300 children and a sports and recreation complex is envisaged in the district,” he said.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News