Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

M. Denisov. Mos.ru

On the Entuziastov highway section, the road surface is being changed; traffic is limited until October 28.

Repairs on the Vladimirsky overpass are planned to be completed by the end of October. On the bridge, the waterproofing and asphalt-concrete pavement is being changed; in total, two thousand square meters of the roadway will be renewed.

Due to road works on the Entuziastov highway section near Burakova street, traffic is limited, one lane is closed in each direction.

Around the work site, a special fence with signal lights has been installed, which are clearly visible in the evening and at night, temporary road signs warn motorists about repairs. All restrictions are planned to be lifted on October 28.

Over the past 10 years, 16 percent of the existing road network has been updated in Moscow – more than thousands of kilometers of roads… This includes 292 artificial structures (bridges, tunnels, overpasses) that were reconstructed or built from scratch, 15 outbound highways, 17 interchanges on the Moscow Ring Road, as well as 200 kilometers of dedicated lanes for public transport.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News