Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Germany / Deutschland –

Source: Swiss Canton of Uri – news in German

October 13, 2020

The building department is improving the lighting in three tunnels on Bauerstrasse. Work will start on October 19, 2020 and will be completed shortly before Christmas of this year. The light in the Schiltegg, Cholrüti and Harderband tunnels is being renewed. The upgrade includes new LED lights, new spotlights, and new markings. The project brings a safety gain for car drivers, pedestrians and cyclists.

There will be traffic delays during the upgrade. The tunnels are worked on one after the other so that two tunnels can always be used without hindrance. In the tunnel in which work is being carried out, the road is single-lane during the day. A traffic service will regulate the traffic on site. At night the road is passable in two lanes. The start is in the Cholrüti tunnel before construction. The canton of Uri is investing 430,000 francs in replacing the lighting.

Inquiries from media professionals: Angel Sanchez, phone +41 41 875 2691, email angel.sanchez@ur.ch

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and / or sentence structure not be perfect.

MIL Translation OSI