Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

E. Samarin. Mos.ru

Almost 21 thousand residents have already moved to new apartments.

In Moscow, thanks to the implementation of the renovation program, 900 thousand square meters of housing were commissioned. Almost 21 thousand residents have already moved to new apartments. This was announced by the head of the department for ensuring the implementation of the program for the renovation of the housing stock of the Moscow Department of Urban Development Policy. Sergey Sidorov.

Currently, about 500 launch sites have been selected.

“The renovation program in Moscow is being actively implemented. To date, 67 residential buildings with a total area of ​​0.9 million square meters have been commissioned. In addition, we have selected 464 launch sites that can provide the commissioning of 7.4 million square meters of housing, ”he stressed.

Sergei Sidorov noted that 83 houses are currently being designed, 178 more are under construction. Their total area will be 4.1 million square meters.

The head of the department added that the mechanism for the integrated development of Moscow territories will allow the involvement of additional land plots for the construction of housing under the renovation program. This will speed up the implementation of the program and will also contribute to the renewal of the urban environment.

The program for the renovation of the housing stock was approved in August 2017 and provides for the resettlement of about a million Muscovites and the resettlement of 5174 houses. You can view the list of houses included in the program and learn more about its implementation in special section the mos.ru portal.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News