Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

Employees of the Housing and Utilities Service No. 2 (Vladivostok) of the Eastern Military District branch of the Federal State Budgetary Institution “Central Housing and Utilities Administration” of the RF Ministry of Defense continue preparations for the beginning of the heating season. According to the approved schedule, hydraulic tests of systems and heating routes for mechanical density are carried out.

Experts check the hot and cold water supply systems, as well as metering devices, in the multi-storey buildings of the service housing stock of the Moscow region within the boundaries of the area of ​​responsibility, they carry out flushing and pressure testing of pipes. Work is underway to prevent, repair and replace equipment, heat-using installations, pipelines of heating networks, internal heating systems of buildings, as well as other measures provided for by the energy saving program for the heating period 2020-2021.

At the end of September, all preparatory measures for the autumn-winter period were completed for the service facilities of ZhKS No. 2 on the territory of military camps. In particular, more than 1000 objects of barracks and housing stock, more than 200 objects of heating and water supply and sewerage facilities have been prepared.

Earlier it was reported that the heating season had already started at the facilities of the Troops and Forces in the North-East of Russia and the Submarine Forces of the Pacific Fleet.

1 2 3 4 5

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and / or sentence structure not be perfect.

MIL OSI Russia News