Post sponsored by NewzEngine.com

Source: US Bureau of Labor Statistics

Source: US State of Missouri

What: Contractor crews resurfacing I-44 will CLOSE the eastbound on and off ramps at the Greene County Route PP/K interchange (mile marker 61) west of Springfield 

When: For short periods between 12:01 a.m. and 4 a.m. Saturday, May 30 

Traffic Impacts:

  • Drivers will not be able to enter eastbound I-44 from Greene County Route PP/K or leave eastbound I-44 at Greene County Route PP/K when crews are paving at the interchange
  • Ramps closed for up to 30 minutes at a time
  • Drivers can reach their destinations by using interchanges on either side of the Route PP/K interchange
  • Drivers urged to find alternate routes 

Details: Work is part of a larger project to resurface I-44, lengthen interchange ramps and install new guardrail between a point east of Missouri Route 96 (Mile Marker 58) and Missouri Route 266/Chestnut Expressway (Mile Marker 72) west of Springfield. 

(Weather and/or construction delays will alter the work schedule) 

END 

(For more information, call MoDOT in Springfield at 417-895-7600 or visit www.modot.org/southwest

(Follow MoDOT’s Southwest District: Facebook | Twitter | Instagram |YouTube) 

(Take the Challenge! Buckle Up/Phone Down)

MIL OSI USA News