Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russia –

Source: Russia Ministry of Energy

Moscow, August 28. Department of operational control and management in power industry of the Ministry of energy, in accordance with the Methodology for assessing the readiness of electric utilities for the heating season, approved by order of the Ministry of energy, evaluated the implementation of power industry entities of the conditions of readiness for the heating season as 25.08.2019 based on the received financial data.The results have been published on the official website of the Ministry of energy.Monthly monitoring is aimed to prevent violations of power supply in a time of complex technological regimes and low temperatures.Reference:In accordance with the Rules of evaluation of readiness of subjects of power industry to work during the heating season, approved by the decree of the Government of the Russian Federation from 10.05.2017 No. 543 of the Ministry of energy of the Russian Federation is the assessment of preparedness for the heating season the power companies, owning the right of ownership or other legal basis of the electric grid facilities of the highest class rated voltage 110 kV and above and (or) objects on production of electric energy with total installed capacity of 25 MW or more, including facilities producing electric energy, functioning in the mode of combined production of electric and thermal energy, and electric power facilities, are the subjects of operatively-dispatching management in electric power industry.

06/28/2019

Moscow, June 27. Joint-stock company “Institute Energosetproekt” marks 57 years since the Foundation.

MIL OSI

EDITOR’S NOTE: This article is a translation from Russian Language to English.

MIL Translation OSI